Question:9
The output of the show frame-relay pvc command shows "PVC STATUS = INACTIVE". What does this mean?
A. The PVC is configured correctly and is operating normally, but no data packets have been detected
for more than five minutes.
B. The PVC is configured correctly, is operating normally, and is no longer actively seeking the address
of the remote router.
C. The PVC is configured correctly, is operating normally, and is waiting for interesting traffic to
trigger a call to the remote router.
D. The PVC is configured correctly on the local switch, but there is a problem on the remote end of
the PVC.
E. The PVC is not configured on the local switch.
Answer: D
Thursday, 9 November 2017
Subscribe to:
Post Comments (Atom)
Latest Cisco 200-105 Exam Practice Questions
Question: 11 Which statement about the IP SLAs ICMP Echo operation is true? A. It is configured in enable mode. B. It is used to determ...
-
Question: 6 Which parameter would you tune to affect the selection of a static route as a backup, when a dynamic protocol is also being us...
-
Question: 11 Which statement about the IP SLAs ICMP Echo operation is true? A. It is configured in enable mode. B. It is used to determ...
-
Question 1 What is a valid HSRP virtual MAC address? A. 0000.5E00.01A3 B. 0007.B400.AE01 C. 0000.0C07.AC15 D. 0007.5E00.B301 Answer...
No comments:
Post a Comment